PE100 HDPE Butt Fusion Pipe Fittings/Flange/Reducer/90° Elbow/Equal Tee

Product Details
Customization: Available
Material: PP HDPE
Connection: Welding
Still deciding? Get samples of US$ 1/Piece
Request Sample
Manufacturer/Factory, Trading Company
Diamond Member Since 2015

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, ISO 9000, ISO 14001, ISO 14000, ISO 20000, ISO 14064, EICC
Terms of Payment
LC, T/T, D/P, PayPal, Western Union, Small-amount payment, Money Gram
  • PE100 HDPE Butt Fusion Pipe Fittings/Flange/Reducer/90° Elbow/Equal Tee
  • PE100 HDPE Butt Fusion Pipe Fittings/Flange/Reducer/90° Elbow/Equal Tee
  • PE100 HDPE Butt Fusion Pipe Fittings/Flange/Reducer/90° Elbow/Equal Tee
  • PE100 HDPE Butt Fusion Pipe Fittings/Flange/Reducer/90° Elbow/Equal Tee
  • PE100 HDPE Butt Fusion Pipe Fittings/Flange/Reducer/90° Elbow/Equal Tee
  • PE100 HDPE Butt Fusion Pipe Fittings/Flange/Reducer/90° Elbow/Equal Tee
Find Similar Products

Basic Info.

Model NO.
pipe fittings
Angle
90 Degree
Wall Thickness
SDR33, SDR26, SDR21, SDR17 SDR13.6 SDR11 SDR9
Certification
GB, GS
Color
Black
Shape
Equal
Transport Package
Ransport Package
Specification
ISO CE
Trademark
SUDA
Origin
China(Mainland)
HS Code
3917210000
Production Capacity
1000/Sets/Months

Product Description

PE HDPE PP electrufusion pipe fittings
PE100 HDPE Butt Fusion Pipe Fittings/Flange/Reducer/90° Elbow/Equal TeePE100 HDPE Butt Fusion Pipe Fittings/Flange/Reducer/90° Elbow/Equal Tee

PE100 HDPE Butt Fusion Pipe Fittings/Flange/Reducer/90° Elbow/Equal Tee


Our Service:

1.  Warranty for 14 months,In warranty time, if non-artificial reason damaged can take old change new for free. Out of warranty time, we can Offer maintenance service (charge for material cost).

2. We accept OEM & ODM

3.In some foreign countries, we have the distributor or agent to sell and warranty the machines, they will supply 24h*7 service. 

4.Most of our machines have the stock,we can delivery the machine 2-3days after received your payment or L/C.

Pls contact me:

SUDA PLASTIC PIPE MACHINERY CO.,LTD


Apple
 
 
Website:http://sudabuttfusionwelder.en.made-in-china.com

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier